More and more goods need to be transferred from road to rail. And in order to reach their destination in the most climate-friendly way possible, more and more people need to switch from cars and aeroplanes to rail transport.  This requires the right infrastructure on and off the tracks. This is where we are helping to make the transport transition a success.

We have been successful in railway construction for many years. We carry out underground cable construction and cable laying work as well as signal foundations, including the necessary planning services for the construction of electronic and digital signal boxes. We also construct track and platform systems.

The team includes highly trained foremen and skilled technicians from the areas of cable route construction, superstructure and platform construction. Site managers ensure that our projects run smoothly.

Rainer Mattern
Dipl.-Ing.

Head of Railway Construction

Telephone +49 (0) 5034 872 22
Email mattern@duensing.de

Thomas Hille

Deputy Head of Railway Construction

Telephone +49 (0) 731 140206 63
Email hille@duensing.de

Our reference projects in the field of railway construction

Route section in Bremen
2022 – 2025 | Hannover

ESTW (Electronic interlocking) Bremen

  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
  • Planning and positioning of two signalling booms
  • Construction of outdoor facilities for modular buildings
  • Renewal of ten level crossings
  • Superstructure work

Construction sum approx. 20 million €
2022 – 2024 | Duisburg

ESTW (Electronic interlocking) Krefeld, ETCS Level 2

  • Civil engineering work
  • Cable laying work
Construction sum € 12.8 million
2019 – 2023 | Frankfurt

DSTW (Digital signal box) Donauwörth

  • Preparation of the execution planning for underground cable construction
  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
  • Superstructure work
Construction sum € 12 million
Route section in Hamburg Bad Oldeslohe
2020 – 2023 | Hamburg

S4 HH-Bad Oldesloe VE11 Cable engineering

  • Underground cable construction work
Construction sum € 3 million
Route section in Munich
2021 | Frankfurt

ESTW (Electronic interlocking) München-Milbertshofen /-Freimann

  • Underground cable construction work
  • Demolition of 2 signal box buildings
Construction sum € 4.2 million
Construction work under a bridge of the Suedbahn railway
2019 – 2022 | Southwest area

TEH 3 VE 410 TEH 3 Electrification of the southern railway from Aulendorf to Friedrichshafen

  • Preparation of the execution planning for underground cable construction
  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
Construction sum € 22 million
Section of the southern railway line
2019 – 2021 | Stuttgart

VE 411 TEH 4 Electrification of the Southern Railway; Friedrichshafen – Lindau, Aeschach; Lake Constance Belt Railway

  • Preparation of the execution planning for
  • underground cable construction
  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
Construction sum € 9.5 million
Section in Oberstaufen
2017 – 2020 | Augsburg

Gap closure KTB Oberstaufen – Hergatz; Lot 1 from Oberstaufen to Röthenbach

  • Preparation of implementation planning for underground cable construction
  • Cable laying work (fibre optics)
Construction sum € 3.9 million
2017 – 2020 | Karlsruhe

ESTW (Electronic interlocking) Dillingen Saar

  • Preparation of the execution planning for
  • underground cable construction
  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
  • Positioning of signalling booms
Construction sum € 7.6 million
2017 – 2019 | Duisburg

ESTW (Electronic interlocking) Mecklenbeck

  • Preparation of the execution planning for
  • underground cable construction
  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
  • Positioning of signalling booms
  • Superstructure work
Construction sum € 2.7 million
2016 – 2018 | Southeast regional area

IKI Ring Südost, Halle-Blankenheim-Wolkramshausen, Eilenburg-Falkenberg

  • Underground cable construction work
  • Cable laying and installation work
  • (LST, TK)
Construction sum € 7.2 million